PARAMETER
Short Information
Project Number: | 3194 |
Project Title: | Fuel Assembly tests Under Servere Accident Conditions |
Project Acromym: | PARAMETER |
Link on the ISTC Web: |
http://www.istc.int/en/project/DBF85940021ED888C3256E5B0042D268 |
Project Deliverables
Name | Description |
3194_WP | Work Plan |
PARAMETER-SF1 - Information Letter | Information Letter on the PARAMETER-SF1 Experiment |
PARAMETER-SF2 - Information Letter | Information Letter on the PARAMETER-SF2 Experiment |
ISTC 3194 - SF1 Protocol | Protocol of PARAMETER-SF1 Experiment Results (April 15, 2006) |
ISTC 3194 - Material Studies | Protocol on teh Results of the Model FA Material Studies After the PARAMETER-SF1 Experiment |
ISTC 3194 - SF2 Protocol | Protocol of PARAMETER-SF2 Eyxperiment Results (April 03, 2007) |
ISTC 3194 -Results of Calculation | The Results of the Calculations of the PARAMETER-SF Experiments |
ISTC 3194 -Final Report | Scientific and Research Final Report on the Work of ISTC Project No. 3194 |
SF2 metallographical Investigation | |
Material_SF2 | report on metallographical Investigation of the SF2 bundle (1st task of the 3690 Project) |
Data set of the PARAMETER-SF1 experiment on top flooding of the VVER test bundle. | |
SF2_data_set | Data set of the PARAMETER-SF2 experiment on bidirctional flooding of the VVER test bundle. |
Project Progress Meeting, Podolsk, 2007 |